- تاریخ ثبتنام
- 2020-06-26
- نوشتهها
- 21,420
- راهحلها
- 27
- پسندها
- 3,264
- امتیازها
- 113
- سن
- 27
- محل سکونت
- England
- وب سایت
- xenforo.xyz
So, I write my own add-ons for my site and I'm constantly upgrading them, or just applying bug fixes, and I wondered how all of you handle this. Do you close your board for each upgrade? Just disable the add-on?
Currently I close the entire board with a message stating "the downtime is expected to last less than two minutes" but I can't help but wonder how many times a member has typed a long reply, hit post, only to be met with a screen letting them know the site is offline for two...
Currently I close the entire board with a message stating "the downtime is expected to last less than two minutes" but I can't help but wonder how many times a member has typed a long reply, hit post, only to be met with a screen letting them know the site is offline for two...
نام موضوع : How do you manage addon upgrades?